Job Experience

 

2021

  • FIRE PROOFING WORK PKG-2 RDMP RU-V Project
    PT. ENVIROMATE TECHNOLOGY INTERNATIONAL – PT. PERTAMINA, BALIKPAPAN RDMP – MECHANICAL WORK – FEBRUARY 2021 – NOW
  • PIPING MODIFICATION FOR PSDM FEBRUARY 2021 PROJECT
    PT. MITSUBISHI CHEMICALS INDONESIA – MERAK – CILEGON – PIPING WORK – FEBRUARY ‘2021 – NOW
  • ROTARY PRESSURE FILTER (RPF) Residu 2021 Project
    PT. MITSUBISHI CHEMICALS INDONESIA – MERAK – CILEGON – MECHANICHAL WORK – FEBRUARY ‘2021 – MARET 2021
  • PIPING WORKS FOR EFFLUENT 2021 PROJECT
    PT. MITSUBISHI CHEMICALS INDONESIA – MERAK – CILEGON – PIPING WORK – MARET ‘2021

2020

  • PIPING WORKS IMPROVEMENTS 2 #PSDM TPA-1 in FEBRUARY 2020 PROJECT
    PT. MITSUBISHI CHEMICALS INDONESIA – MERAK – CILEGON – PIPING WORK – FEBRUARY ‘2020 – APRIL ‘2020
  • PPING MODIFICATION FOR PSDM FEBRUARY 2020 PROJECT
    PT. MITSUBISHI CHEMICALS INDONESIA – MERAK – CILEGON – PIPING WORK – FEBRUARY ‘2020 – MARET ‘2020
  • PROCUREMENT and ENGINEERING CONSTRUCTION OF MECHANICAL PACKAGE #1 – SPHERICAL TANK IN RDMP RU-V PROJECT
    PT. ENVIROMATE TECHNOLOGY INTERNATIONAL – PT. PERTAMINA, BALIKPAPAN RDMP – MECHANICAL WORK – FEBRUARY 2020 – NOW
  • FIRE PROOFING WORK PKG-2 RDMP RU-V Project
    PT. ENVIROMATE TECHNOLOGY INTERNATIONAL – PT. PERTAMINA, BALIKPAPAN RDMP – MECHANICAL WORK – FEBRUARY 2020 – NOW

2019

  • DISMANTLE & RE-INSTALL of 3-R2 (REACTOR PACOL) PROJECT
    PT. UNGGUL INDAH CAHAYA,Tbk – MERAK – CILEGON – MECHANICAL WORK – FEBRUARY ‘2019 – APRIL ‘2019
  • PPING MODIFICATION FOR RESIDUE 1ST PROJECT
    PT. MITSUBISHI CHEMICALS INDONESIA – MERAK – CILEGON – PIPING WORK – MAY ‘2019 – JULY ‘2019
  • SUPPLY MATERIAL : INTERCOOLER CONDESATE TANK Project
    PT. MITSUBISHI CHEMICALS INDONESIA – MERAK – CILEGON – PIPING WORK – AUG ‘2019 – NOV ‘2019
  • PPING MODIFICATION FOR RESIDUE 2ND PROJECT
    PT. MITSUBISHI CHEMICALS INDONESIA – MERAK – CILEGON – PIPING WORK – SEPT ‘2019 – NOV ‘2019

2015

  • Refractory Work ( Castable & Ceramic Fiber Application )
  • For Kuwait National Petroleum Company (KNPC ) / CLEAN FUELS Project
  • 755557_24x24Furnace Engineering INC. Yokohama, Japan
  • PT Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
  • ASC PHASE – VI PROJECT (PACKAGE – 1)
    JO. LOTTE E&C – JAYA KENCANA – ANYER – CILEGON – REFRACTORY WORK – AUGUST ‘2015 – FEBRUARY ‘2016
  • INSTALLATION MECHANICAL & STRUCTURE TPJ-2 PROJECT
    PT. PT. TORAY POLYTECH JAKARTA – TANGERANG – BANTEN – MECHANICAL WORK – DECEMBER ‘2015 – JUNE ‘2016

2014

  • Refractory Work ( Castable & Ceramic Fiber Application )
    For JGCS / Nghi Son Refinery & Petrochemical, Vietnam ‘ NSRP’ Project
  • 755557_24x24Furnace Engineering INC. Yokohama, Japan
    PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
  • 755557_24x24Refractory Work ( Castable & Ceramic Fiber Application ) For LR – 2 Refinery Project
    PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
  • 755557_24x24Installation Autoclave 8 Unit ( Jacking System )
    PT. Broco Aerated Concrete Industry – Cikande, Serang – Indonesia
  • 755557_24x24Refractory Work ( Castable & Ceramic Fiber Application ) For ARL UPGRADATION Project
    PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
  • 755557_24x24Open-Close All Manhole, Stop Log, Pumping Out of Water & Cleaning Inside
    For Dewatering & Cleaning Inside Intake Bay Area Project PT. Merak Energi Indonesia – Cilegon , Banten
  • 755557_24x24TAR-2014 General Static Job Package ( Oxidation & PTA )
    PT. BP Petrochemicals Indonesia, Tanjung Gerem, Merak – Cilegon , Banten
  • 755557_24x24TAR-2014 SWI Job Package
    PT. BP Petrochemicals Indonesia, Tanjung Gerem, Merak – Cilegon , Banten
  • TAR-2014 GENERAL STATIC JOB PACKAGE (OXIDATION & PTA)
    PT. BP PETROCHEMICALS INDONESIA – MERAK – CILEGON – MECHANICAL WORK – JULY ‘2014 – OCTOBER ‘2014
  • TAR-2014 SWI JOB PACKAGE
    PT. BP PETROCHEMICALS INDONESIA – MERAK – CILEGON – MECHANICAL WORK – JULY ‘2014 – OCTOBER ‘2014
  • INSTALLATION AUTOCLAVE 8 UNIT (JACKING SYSTEM)
    PT. BROCO AERATED CONCRETE INDUSTRY – CIKANDE – BANTEN – MECHANICAL WORK – APRIL ‘2014 – DECEMBER ‘2014
  • “PUSRI IIB PROJECT
    FURNACE ENGINEERING INDONESIA – LAMPUNG – REFRACTORY WORK – JULY ‘2014 – DECEMBER ‘2014
  • ” JGC /NSRP, VIETNAM PROJECT”
    FURNACE ENGINEERING INDONESIA – LAMPUNG – REFRACTORY WORK – JULY ‘2014 – DECEMBER ‘2014
  • ARL UPGRADATION PROJECT
    PT. HANJUNG INDONESIA – LAMPUNG – REFRACTORY WORK – JULY ‘2014 – OCTOBER ‘2014
  • LR – 2 REFINERY PROJECT
    PT. HANJUNG INDONESIA – LAMPUNG – REFRACTORY WORK – DECEMBER ‘2014 – JUNE ‘2015

2013

  • Refractory Work (Cascable & Ceramic Fiber Application) For Boustead International Heaters Project
  • Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • 755557_24x24Refractory Work (Cascable & Ceramic Fiber Application) For TAIF – NK VCC LLE2 Project
  • Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • 755557_24x24Refractory Work (Cascable & Ceramic Fiber Application) For JGC / PETRONAS TRAIN – 9 Project
  • Furnace Engineering INC. Yokohama, Japan
  • Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • BOUSTEAD INTERNATIONAL HEATERS PROJECT
    PT. HANJUNG INDONESIA – LAMPUNG – REFRACTORY WORK – JULY ‘2013 – NOVEMBER ‘2013
  • “TAIF NKK VCC LLE2 Project
    PT. HANJUNG INDONESIA – LAMPUNG – REFRACTORY WORK – NOVEMBER ‘2013 – MARCH ‘2014
  • ” JGC / PETRONAS TRAIN-9, MALAYSIA Project
    FURNACE ENGINEERING INDONESIA – LAMPUNG – REFRACTORY WORK – DECEMBER ‘2013 – JULY ‘2014

2012

  • Installation Mechanical & Structure TPJ – 1 Project
    PT. Toray Plytech Jakarta – Tangerang, Banten
  • 755557_24x24Baiji Furnace Supply – North Refineries Company – Baiji / Republic of Iraq (Refractory work for Oil Heater) Furnace Engineering INC. Yokohama, Japan PT. Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • 755557_24x24Labour Supply for Welding Plate Inside 450 – 511 Project
    PT. Unggul Indah Cahaya Tbk, Merak – Cilegon, Banten
  • 755557_24x24Labour supply for Fabrication Off Flow Meter Assembling Project
    PT. Unggul Indah Cahaya Tbk, Merak – Cilegon, Banten
  • 755557_24x24Labour Supply for Shutdown UAB #1 & UAB #2. Project
    PT. Unggul Indah Cahaya Tbk, Merak – Cilegon, Banten
  • 755557_24x24Labour Supply for Install 460 – E 19 (EX-3-E12/3 – E/1/2/3 Project
    PT. Unggul Indah Cahaya Tbk, Merak – Cilegon, Banten
  • 755557_24x24Labour Supply for Repair Pacol Project
    PT. Unggul Indah Cahaya Tbk, Merak – Cilegon, Banten
  • INSTALLATION MECHANICAL & STRUCTURE TPJ-1 PROJECT
    PT. PT. TORAY POLYTECH JAKARTA – TANGERANG – BANTEN – MECHANICAL WORK – JUNE ‘2012 – FEBRUARY ‘2013
  • BAIJI FURNACE SUPPLY PROJECT / CHIYODA
    PT. HANJUNG INDONESIA – LAMPUNG – REFRACTORY WORK – JULY ‘2012 – NOVEMBER ‘2012

2011

  • DEBOTTLENECK EDC PROJECT
    PT. Sulfindo Adiusaha – Cilegon
  • 755557_24x24Piping Work – 2x60MW MERAK CFPP Project, POSCO Engineering Company
    PT. MERAK ENERGI INDONESIA (MEI)
  • 755557_24x24Shutdown April 2011 Static Equipment
    PT. Amoco Mitsui PTA Indonesia – Merak, Banten
  • 755557_24x24BE-312 Permanent Caustic Line & Inject Services Water to Outlet Effluent Water
    PT. Amoco Mitsui PTA Indonesia – Merak, Banten
  • 755557_24x242BA – 301 Coil A and Coil B Repair Welding Line
    PT. Styrindo Wono Indonesia (SMI) / PT. Chandra Asri Petrochemical
  • 755557_24x24Inland Transportation & Installation Buffer Tank 250 M3
    PT. Air Liquide at Afindo Gunung Garuda, Cibitung Bekasi – Jawa Barat
  • DEBOTTLENECK EDC PROJECT- PIPING STEEL PART 1
    PT. SULFINDO ADIUSAHA – MERAK – CILEGON – PIPING WORK – JULY ‘2011 – DECEMBER ‘2011
  • 2x60MW MERAK CFPP Project
    PT. MERAK ENERGI INDONESIA – MERAK – CILEGON – PIPING WORK, FIRE FIGHTING, CATHODIC – JUNE ‘ 2011 – DECEMBER ‘2013
  • 2BA – 301 COIL A and COIL B REPAIR WELDING LINE
    PT. CHANDRA ASRI PETROCHEMICAL – MERAK – CILEGON – FABRICATION & INSTALLATION – AUGUST ‘2011 – DECEMBER ‘2011
  • SHUTDOWN STATIC EQUIPMENT
    PT. AMOCO MITSUI PTA INDONESIA – MERAK – CILEGON – FABRICATION & INSTALLATION – JULY ‘2011 – DECEMBER ‘2011

 

 

 

 

 

 

 

 

2010

  • Installation Autoclave 3 Unit (Jacking system)
    PT. Broco Aerated Concrete Industry – Cikande, Serang – Indonesia
  • 755557_24x24Civil Work (MOC-740/741 Dust Collector Bin at the %-C-847 Outlet)
    PT. TITAN Petrokimia Nusantara, Desa Rawa Arum – Merak, Banten
  • 755557_24x24SHUTDOWN DECOAKING EDC & VCM PLANT
    PT. Sulfindo Adiusaha – Cilegon
  • 755557_24x24TAR-2010 for Static Equipment Job Package Pressure Vessel (Drum, Tank & Tank Column)
    PT. AMOCO Mitsui PTA Indonesia, Desa Rawa Arum – Merak
  • 755557_24x24MOC – 763 Interconnection Line Between FPU – 0 to FPU 3
    PT. TITAN Petrokimia Nusantara, Desa Rawa Arum – Merak, Banten

2009

  • Fabricate Installation Temporary Support Train 3 Shutdown
    PT. TITAN Petrokimia Nusantara, Desa Rawa Arum – Merak, Banten
  • 755557_24x24Fabricate Flange 6″ S/S & Installation for Spool Piece MOC – 749
    PT. TITAN Petrokimia Nusantara, Desa Rawa Arum – Merak, Banten
  • 755557_24x24Paiton III Coal Bunker (Fabrication work 560 Ton)
    PT. Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • 755557_24x24Abu Dhabi Oil Co., Ltd./U.E.A (Refractory Work for Oil Heater)
    Furnace Engineering INC. Yokohama, Japan
  • 755557_24x24Fabrication Work for Tanjung Jati B – Non Pressure Part – Unit 3 & Unit 4
    PT. Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • 755557_24x24Labour Supply for RMQC & RTGC Ground Assy Work
    PT. Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • 755557_24x24Installation Internal Tray in the Column – 16 Units
    PT. Dekyung Indah Heavy Industry
  • 755557_24x24Supply & Install Ceramic Fiber Blanket
    Furnace Engineering Inc. Japan

2008

  • Supply & Install of Insulation for Kandla RMQC – PT. Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • 755557_24x24Maintenance Shutdown Work VCM Plant Decoaking – PT. Sulfindo Adiusaha – Cilegon
  • 755557_24x24Install Permanent Flexible Hose Unloading Facility – Jib Crane
    PT. TITAN Petrokimia Nusantara, – Merak, Banten
  • 755557_24x24Sprinkler Pipe shares Tank – PT. Sulfindo Adiusaha – Cilegon
  • 755557_24x24Final Painting Shares Tank – PT. Sulfindo Adiusaha – Cilegon
  • 755557_24x24Fabrication Lower & Upper Structure Electrostatic precipitator
    PT. Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • 755557_24x24Supply Material Bolt/Nuts/Washer & Gasket for Acid Gas Incinerator Tangguh Project
    JGC Corporation Japan – Papua, Irian Jaya

2007

  • Gas Duct ID Fan Sipat #3 – PT. Hanjung Indonesia – Srengsem Panjang, Bandar Lampung
  • Trial Installation of Acid Gas Preheater (AGPH) / Air Preheater (APH) Tube Bundle – JGC Corporation Japan – Papua, Irian Jaya
  • Maintenance Work EDC Plant – PT. Sulfindo Adiusaha – Cilegon
  • Steel Fabrication Work of Electrostatic Precipitator Weight 1.380 tons
    Hitachi Plant Technologies – Japan Maidura Power Plant

2006

  • Static Equipment Services Package – PT. Amoco – Cilegon
  • Erection of Autoclaves 5 sets – PT. Broco Aerated Concrete Industry – Cikande
  • Supply & Install of Insulation – PT. UIC – Cilegon
  • Steel Fabrication Work of Acid Gas Incinerator Tangguh Project – JGC Corporation Japan – Papua Irian Jaya
  • Maintenance Shutdown – PT. Sulfindo Adiusaha – Cilegon
  • 7Modification Fuel Gas Burner of 3-HIA – PT. UIC – Cilegon
  • Supply & Install of Hot Insulation – PT. UIC – Cilegon
  • Supply & Install of Insulation – PT. Broco Aerated Concrete Industry – Cikande
  • Replacement & Modification Fire Water Line to MFI PT. Mitsubishi Chemical Indonesia – PT. Mitsubishi Chemical Engineering Indonesia – Cilegon
  • Replacement Transferline GH 404-B.02 & RX.421 – D – 02 (Compensator) PT. Krakatau Steel – PT. Krakatau Steel – Cilegon
  • Dismantle & Repair Butterfly Valve 10″ SW Line PT. PT. Mitsubishi Chemical Indonesia – PT. Mitsubishi Chemical Engineering Indonesia – Cilegon
  • Kaltim 4 Refinery Primary Reformer Heater Tube Repairing – Kaltim 4 – Bontang Kalimantan Timur
  • 4Balongan Fired Heater Radiant Section Tube Support Inspection – Mitsubishi Heavy Industry – Balongan Indramayu
  • 24Painting Work PT. Mitsui Eterindo Chemical – PT. Mitsui Eterindo Chemical – Cilegon
  • Fabricate Ditch & Foundation Pump PT. PT. Mitsui Eterindo Chemical – PT. Mitsui Eterindo Chemical – Cilegon
  • Remove Existing Burner & Install New Burner PT. Sulfindo Adiusaha – Cilegon

2005

  • Replacement of Internal Tray Solvent Dehydration Tower BT-403 PT. Amoco Mitsui – AMT Pacific Co., Ltd Korea – Cilegon
  • 24ME AC Hydrolysis Sistem Project PT. Amoco Mitsui – Mets Korea – Cilegon
  • Supply & Install of Insulation PT. Unggul Indah Cahaya, Tbk – PT. Unggul Indah Cahaya – Cilegon
  • Fabricate Vent. Pipe & Support Assembly for I-H-201 Primary Reformer Kaltim – Furnace Engineering Inc. Yokohama – Kaltim
  • Install Sundyne Pump PT. Amoco Mitsui – Met’s Korea – Cilegon
  • Replacement of Rotary Valve BP-709B PT. Amoco Mitsui – Met’s Korea – Cilegon
  • Mechanical & Piping Work for Lab Plant Revamp PT. Unggul Indah Cahaya – Daevoo Engineering – Korea – Cilegon
  • Engineering Supervision & Inspection of Balongan Blue Sky Fire Heater Project
    Fabrication by PP include; Change Heater (small), Naptua Stripper Reboiler (small), Naptua Stripper Reboiler (big), Change Heater & 1/2 Heater (big), Castable & Refactory – FEI /Toyo Engineering (TEC) – kaltim – Balongan Refinery
  • Fabrication & Install Ducting Cooling Fan Motor Screw B/B4 Bridgestone – PT. Dayadumas Lestari – Bekasi
  • Repair of EDC Cracking Furnace VF-211 – PT. Satomo Indovyl Monomer – merak
  • Supply Anchor Bolt for Furnace Toyo Eng. Co – Balongan Blue Sky Project Pertamina – Furnace Engineering Inc. Yokohama – Balongan – Indramayu

2004

  • Supply Fire Brick SK-34 & Air Setting Mortar SK-34 Toyo Eng. Co. Balongan Blue Sky Project Pertamina Furnace Engineering Inc. Yokohama – Balongan – Indramayu
  • Repairing TE Nozzles At Outlet of VF-211 – PT. Satomo Indovyl Monomer – Merak
  • Repair & Services CDU Heater H-101 Topping Plant Petrochina International (Bermuda) – Sorong – PT. Adiprotek Enviro Dunia – Sorong-Papua
  • Supply & Install of Insulation PT. Unggul Indah Cahaya, Tbk – PT. Unggul Indah Cahaya, Tbk – Cilegon

2003

  • Supply & Install of Insulation – PT. Unggul Indah Cahaya, Tbk – Cilegon
  • Repair & Replacement of Burner Assembly & Radiant Floor of Hot Oil Heater – PT. Unggul Indah Cahaya, Tbk – Cilegon
  • Replacement of Internal Tray PT Amoco For Tower BT-403 & BT-1821 – AMT Pacific Co., Ltd. – Korea

2002

  • Heater Improvement Project Oil – PT. Amoco Mitsui PTA – Indonesia – Cilegon
  • Install Reactor O2 Analyzer PT. Amoco Mitsui – Mets – Korea – Cilegon
  • Recondition Screw Conveyor & Bowl PT. Amoco Mitsui – Mets – Korea – Cilegon

2001

  • PTA-2PJ/2H – 5301 (Incinerator Unit) – Furnace Engineering Inc. Yokohama – Iran